Hydraulic installation and on-board piping

Hydraulic installation at the shipyard, on board and in the plant: isometric pipe fabrication, on-board piping, hose assemblies, pressure testing and supervision.

Stainless hydraulic tube runs in a ship corridor
45
Technical staff
4
On-board projects in progress
3
Locations · İstanbul, Yalova
01 Technical summary Hydraulic Installation and Piping
01

From isometric to vessel

We prepare the pipe runs in the workshop to the isometric drawings, form the ends and send them to the vessel or site numbered. Installation on site is completed with clamping, connection, pressure testing and flushing.

Because the same team builds the power units and cylinders, the piping is done by people who know the system.

02

Stainless piping

On deck and in exposed areas we use stainless tube with Danfoss stainless fittings. WALFORMplus reduces the need for welding, which lightens the load of hot-work permits, radiography and post-weld cleaning.

03

Hydraulic hoses

For connections to moving equipment we make up hydraulic hoses to length and install them. We also provide hose replacement service on board and on site.

04

Supervision

If you install with your own crew, we provide hydraulic system supervision: making sure the installation, cleaning, testing and commissioning steps are done correctly and in the right order.

02 Work in progress

On board
right now.

  • Cemre ShipyardNB1102 · offshore supply vessel
  • Özata ShipyardNB102 – NB104 · ferry project
  • Habaş60-ton HIAP
  • DamenYS5304 – YS5305 · 53 m superyacht
03 From the workshop and the field
  • Hydraulic tube runs connected to a valve group
  • Clamped tube runs on board
  • Hydraulic crane and hose group on a ship deck
  • Commissioned hydraulic power unit on board
  • Accumulator station on board
  • Ser Hidrolik factory in Yalova
04 Frequently asked

Questions,
answers.

What is on-board piping?

It is the laying, connecting, testing and cleaning of hydraulic pipe runs on a vessel, between the engine room and the decks. Pipes prepared in the workshop to isometric drawings are installed on board.

Which shipyards do you work with?

Our factory is in the Altınova shipyard zone in Yalova, very close to the yards there. Our references include Tersan, Cemre, Sefine, Özata and Uzmar shipyards and Damen projects.

Can we take supervision only?

Yes. While you install with your own crew, we can provide hydraulic system supervision, testing and commissioning support.

Do you flush after installation?

Yes. Pickling, flushing and particle counting are the natural continuation of installation; we hand over with a reported cleanliness class.

Quotation and technical support

Let’s talk about your project.

A cylinder size, a power unit capacity or a piping job on board: tell us what you need and our engineering team will come back with a technical solution and a quote.

Quotation and technical support

Request a quote

Pressing send opens your e-mail app with the message ready.