Hydraulic installation at the shipyard, on board and in the plant: isometric pipe fabrication, on-board piping, hose assemblies, pressure testing and supervision.
01Technical summaryHydraulic Installation and Piping
01
From isometric to vessel
We prepare the pipe runs in the workshop to the isometric drawings, form the ends and send them to the vessel or site numbered. Installation on site is completed with clamping, connection, pressure testing and flushing.
Because the same team builds the power units and cylinders, the piping is done by people who know the system.
02
Stainless piping
On deck and in exposed areas we use stainless tube with Danfoss stainless fittings. WALFORMplus reduces the need for welding, which lightens the load of hot-work permits, radiography and post-weld cleaning.
03
Hydraulic hoses
For connections to moving equipment we make up hydraulic hoses to length and install them. We also provide hose replacement service on board and on site.
04
Supervision
If you install with your own crew, we provide hydraulic system supervision: making sure the installation, cleaning, testing and commissioning steps are done correctly and in the right order.
02Work in progress
On board right now.
Cemre ShipyardNB1102 · offshore supply vessel
Özata ShipyardNB102 – NB104 · ferry project
Habaş60-ton HIAP
DamenYS5304 – YS5305 · 53 m superyacht
03From the workshop and the field
04Frequently asked
Questions, answers.
What is on-board piping?
It is the laying, connecting, testing and cleaning of hydraulic pipe runs on a vessel, between the engine room and the decks. Pipes prepared in the workshop to isometric drawings are installed on board.
Which shipyards do you work with?
Our factory is in the Altınova shipyard zone in Yalova, very close to the yards there. Our references include Tersan, Cemre, Sefine, Özata and Uzmar shipyards and Damen projects.
Can we take supervision only?
Yes. While you install with your own crew, we can provide hydraulic system supervision, testing and commissioning support.
Do you flush after installation?
Yes. Pickling, flushing and particle counting are the natural continuation of installation; we hand over with a reported cleanliness class.
A cylinder size, a power unit capacity or a piping job on board: tell us what you need and our engineering team will come back with a technical solution and a quote.